|
The following are the current electric rates that the coop
offers. These rates are for reference only. For further details please call
the coop at (409) 423-2241 or 1-800-231-9340.
Rates
Effective August 1, 2002
The five base rates listed below are adjusted upward or downward monthly depending on
changes in the cooperatives cost of wholesale power. The adjustment is shown on
members bills as the PCRF (Power Cost Recovery Factor).
RATE SCHEDULE
Farm and Home Service (Schedule "R")
(Available for permanent residential consumer installations with a metered demand of 50
kW or less.)
- Customer Charge, per month $8.00
- All kWh 6.682˘ per kWh
General Service (Schedule "G")
(Available for general installations, commercial service, schools, churches, or other
public buildings, and three-phase residential and farm service with metered demand of 50
kW or less.)
- Customer Charge, per month $10.00
- All kWh 6.722˘ per kWh
Minimum Monthly Charge will be the greater of the following:
A. Single phase $10.00
B. Multi-phase $20.00
C. The minimum monthly charge specified in the contract for service.
Late Payment Charge: In the event the current monthly bill is not paid by the due date,
a five percent (5%) penalty will be added to the non-residential bill.
Churches and Schools Service (Schedule "CS")
(Available to public schools, and church facilities with metered demands exceeding 50
kW in two or more of the preceding twelve months. A consumer must remain on this rate
schedule for a minimum of twelve months before receiving service under another rate
schedule.)
- Customer Charge, per month $60.00
- Demand Charge, all kW $6.85 per kW
- Energy Charge, all kWh 3.00˘ per kWh
Minimum monthly charge will be the greater of the following:
A. The minimum monthly charge specified in the contract for service.
B. A charge of $1.15 per kVA of installed transformer capacity.
Late Payment Charge: In the event the current monthly bill is not paid by the due date,
a five percent (5%) penalty will be added to the non-residential bill.
Large Power Service (Schedule "LP")
(Available to consumers with metered demands exceeding 50 kW in two or more of the
preceding twelve months. A consumer must remain on this rate schedule for a minimum of
twelve months before receiving service under another rate schedule.)
- Customer Charge, per month $60.00
- Demand Charge, all kW $6.85 per kW
- Energy Charge, all kW 3.49˘ per kWh
Minimum monthly charge will be the greater of the following:
A. The minimum monthly charge specified in the contract for service.
B. A charge of $1.15 per kVA of installed transformer capacity.
Late Payment Charge: In the event the current monthly bill is not paid by the due date,
a five percent (5%) penalty will be added to the non-residential bill.
Security Lighting (Schedule "SL")
(Applicable to all residential farm and home service, commercial establishments,
industrial and for street or parkway lighting.)
Security Lighting Options Offered
- 175 W mercury vapor $6.90/mo. plus PCRF for 70 kWh
- 400 W mercury vapor $10.20/mo.
plus PCRF for 180 kWh
- 400 W metal halide
$10.20/mo.
plus PCRF for 180 kWh
Line Extension Policy - For information about JNECs line extension policy,
please contact the Engineering Department.
Easements - All member/applicants who request service from the cooperative are
required to secure the necessary right(s)-of-way easement(s) for the electric lines over
and across all lands necessary for providing service to the member/applicant, including
land which they do not own. Typical right(s)-of-way are 20 feet in width. |